We build to the approved drawings in a controlled workshop, check quality at each step and test the complete system before it leaves. Problems are found in the workshop, where they cost the least to fix.
Fabrication of skid frames and structures
Piping, valves and fittings supplied and fitted
Mechanical, electrical and instrument assembly
Hydrostatic, pressure and functional tests before dispatch
Inspection records and test certificates
Factory acceptance test (FAT) with you or your representative
What You get
A system proven to work before it reaches your site